Construction of a technical block and a control tower (equipment component) – Cotonou Airport

Client: ASECNA — Benin Representation

Entry into force: November 2022

On-site acceptance: September 2023 / April 202

End user: Cotonou Airport

Aeronav client / project ref.: 2022/0328/ASECNA/DGDD/DETD · 2675-952-0422

 

Transfer of equipment to the new control tower; implementation of a high-quality power network, IT/telephone cabling, video surveillance, and access control; VDI pre-cabling. Supply, integration, installation, and training for: tower consoles, VHF, fiber-optic inter-site links, VDI cabling, access control, IP PBX, monitoring systems, video surveillance, time synchronization, and high-quality power distribution.